Call/Text: (555) 123-4567  |  Serving DFW  |  Same-Day Reports — Guaranteed
New Construction — Phase 3

Final Walkthrough Inspection.
Before You Sign at Closing.

Just because it's new doesn't mean it's right. A final walkthrough inspection before closing catches issues while the builder is still responsible — not after you own the problem.

Three Critical Inspection Points

New construction inspections happen at three stages of the build — each catching issues only visible at that moment.

1

Pre-Pour Foundation

Before concrete is poured — inspect grade preparation, reinforcement, and form placement.

Learn More →
2

Pre-Drywall Framing

Before drywall is hung — inspect framing, rough-in plumbing, electrical, and HVAC.

Learn More →
3

Final Walkthrough

Before closing — inspect all completed systems, finishes, and builder-installed components.

You Are Here
New construction final inspection DFW

Everything the Builder Installed — Verified

At the final walkthrough, every system should be fully installed and operational. We verify it actually is — because builder subcontractors are human, and humans make mistakes under production pressure.

  • All completed electrical, plumbing, and HVAC systems
  • Installed fixtures, appliances, and finishes
  • Roof covering and attic insulation
  • Windows, doors, and weatherstripping
  • Grading, drainage, and exterior
  • Builder punchlist items — verified complete
  • Thermal imaging, WDI, foundation elevation, and irrigation — all included
Book Phase 3 Inspection

11-Month Warranty Inspection

Before your builder warranty expires, we document every defect — so repairs get completed at the builder's cost, not yours. Schedule at 10–11 months after closing.

Schedule 11-Month Inspection

Ready to Schedule?

Book online for instant pricing and real-time availability. Same-day reports guaranteed.

Book Your Inspection
📅 Book Now